Filtro Noticias
Search filter

Prefabricados Delta wins the contract for the supply of concrete sleepers for the needs of works and maintenance in the Railway Network of the South and Central Spain Zones

22/11/2021

Prefabricados Delta wins the contract for the supply of concrete sleepers for the needs of works and maintenance in the Railway Network of the South and Central Spain Zones

Prefabricados Delta wins the contract for the supply of concrete sleepers for the needs of works and maintenance in the Railway Network of the South and Central Spain Zones

Prefabricados Delta has won the contract to supply monobloc concrete sleepers for the works and maintenance needs of conventional railway networks (Lot 1: Center and Lot 6: South).

The contract, which will last for three years, includes the manufacture of the sleepers and their disposal and loading at collection points.

Of the lots destined for the conventional network, Lot 1 and Lot 6, which include the central and southern areas of Spain, have an amount of more than 8 million euros and more than 7.5 million euros respectively.