Filtro Noticias
Search filter

Prefabricados Delta has supplied the prefabricated ballastless track system in the railway León - Asturias High Speed Line. Section: La Robla-Campomanes

04/12/2020

Prefabricados Delta has supplied the prefabricated ballastless track system in the railway León - Asturias High Speed Line. Section: La Robla-Campomanes

Prefabricados Delta has supplied the prefabricated ballastless track system in the railway León - Asturias High Speed Line. Section: La Robla-Campomanes

Prefabricados Delta has supplied the prefabricated ballastless track system with multipurpose width (VPP) and mixed width (VPM) for the slab track for the León - Asturias High Speed Line. Section: La Robla-Campomanes.

The supply is for the slab track of the Huerna and San Blas viaducts.

The company awarded the assembly and commissioning is FCC Construcción and the end customer is ADIF.

With this supply and the international width of the Campobecerros-Taboadela, L.A.V. Madrid-Galicia Prefabricados Delta completes its range of products for all widths: international, multipurpose (Iberian width) and mixed width (three rails).