Filtro Noticias
Search filter

Latest News

24/02/2023

Prefabricated Delta signs its I Equality Plan

READ MORE

Prefabricados Delta has signed its I Equality Plan, thus declaring the will to make effective the right to equal treatment and opportunities between women and men and the adoption of the necessary preventive and corrective measures so that our organization cannot produce discrimination for reasons of sex.

17/02/2023

Prefabricados Delta will participate in the Zaragoza SMAGUA 2023 water fair

READ MORE

Prefabricados Delta will participate in the International Water and Irrigation Exhibition "SMAGUA 2023" held in Zaragoza.

30/01/2023

Prefabricados Delta wins new contracts for the supply of railway sleepers in the renewal of the track in Huelva

READ MORE

Prefabricados Delta has won new contracts for the supply of sleepers for the renewal of two sections of the Zafra-Huelva conventional line tendered by ADIF.

23/12/2022

Prefabricados Delta wins the supply contract for the main pipeline for the modernization of the Cuevas del Campo community irrigation system (Granada)

READ MORE

Prefabricados Delta wins the supply contract for the main pipeline for the modernization of the Cuevas del Campo community irrigation system (Granada). The supplied pipe is made of post-stressed concrete with a sheet metal sleeve and an elastic joint.

20/06/2022

Prefabricados Delta participates in the “Nuevo Regadío Forum”

READ MORE

Prefabricados Delta will participate as a sponsor and speaker in the “Nuevo Regadío Forum” that is held online from June 27 to July 1.