Filtro Noticias
Search filter

Prefabricados Delta wins the contract to supply sleepers for the renovation of the Madrid-Seville High Speed Line (Spain)

07/03/2024

Prefabricados Delta wins the contract to supply sleepers for the renovation of the Madrid-Seville High Speed Line (Spain)

Prefabricados Delta wins the contract to supply sleepers for the renovation of the Madrid-Seville High Speed Line (Spain)

Prefabricados Delta has won the contract for ADIF to supply and transport sleepers for the renewal of sleepers (Phase 2) and ballast stripping on the Madrid-Seville High Speed Line (Spain).

The contract consists of the supply of 130,000 AI-VE type monobloc sleepers for the 60 E1 rail type. It has an amount of 13.5 million euros and an execution period of 12 months.

The sleepers will be manufactured at the Prefabricados Delta plant in Puente Genil (Córdoba), where more than 5 million sleepers have been manufactured and supplied since its launch.