Prefabricados Delta completes the supply of the main pipeline for the Irrigation Modernization Project in the irrigable zone dependent on the Canal del Páramo Bajo. Sector VII and VIII (León-Zamora)
READ MOREPrefabricados Delta has supplied 7,100 meters of prestressed concrete pipe with Steel cylinder and double elastic joint with a diameter of DN1600 and a pressure of 4 atm.